PIID 36C25223C0072· VHA· 252-NETWORK CONTRACT OFFICE 12 (36C252)· Z2NZ · REPAIR OR ALTERATION OF OTHER UTILITIES· FY2023· $34,163,814 net obligations· UEI TJJ6HHAK46Z3· IL

Description

PROJECT 578-17-027: P0008: PROVIDE UNANTICIPATED ELECTRICAL REPAIRS AT VAULT 5 AND ASSOCIATED PIPES. MOD INVOLVES RECOVERY OF EXTRA COSTS DUE TO DOWNTIME AND NECESSARY OVERTIME TO MAINTAIN PROJECT SCHEDULE.

Base award description: PROJECT 578-17-027: REPLACE EXISTING STEAM PIPE FROM VAULT 9 TO VAULT 7 STEAM TUNNEL AND REPLACE STEAM PIPE BETWEEN VAULT 9 AND PIT 5 AT THE HINES VA HOSPITAL.

First action · last action
2023-09-26 · 2026-07-29
Transactions
10
First transaction's obligation
$27,979,166
Base + all options value (sum of deltas)
$34,163,814
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Offers received
3
SDVOSB flag on record
Yes (self-representation)
NAICS
238220 · PLUMBING, HEATING, AND AIR-CONDITIONING CONTRACTORS

Modification chain · 10 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$34,163,814$0Base award · 2023-09-26 · this action $27,979,166 · running total $27,979,166Modification P00001 · 2024-03-19 · this action $176,997 · running total $28,156,163Modification P00002 · 2024-04-12 · this action $0 · running total $28,156,163Modification P00003 · 2024-07-18 · this action $2,617,462 · running total $30,773,625Modification P00004 · 2024-08-19 · this action $165,943 · running total $30,939,567Modification P00005 · 2025-08-04 · this action $1,721,498 · running total $32,661,066Modification P00006 · 2025-09-22 · this action $37,710 · running total $32,698,776Modification P00007 · 2025-11-25 · this action $857,058 · running total $33,555,834Modification P00008 · 2026-04-22 · this action $114,195 · running total $33,670,029Modification P00009 · 2026-07-29 · this action $493,785 · running total $34,163,814
  • Base2023-09-26+$27,979,166= $27,979,166
  • Mod P000012024-03-19+$176,997= $28,156,163
  • Mod P000022024-04-12+$0= $28,156,163
  • Mod P000032024-07-18+$2,617,462= $30,773,625
  • Mod P000042024-08-19+$165,943= $30,939,567
  • Mod P000052025-08-04+$1,721,498= $32,661,066
  • Mod P000062025-09-22+$37,710= $32,698,776
  • Mod P000072025-11-25+$857,058= $33,555,834
  • Mod P000082026-04-22+$114,195= $33,670,029
  • Mod P000092026-07-29+$493,785= $34,163,814
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2023-09-26+$27,979,166$27,979,166PROJECT 578-17-027: REPLACE EXISTING STEAM PIPE FROM VAULT 9 TO VAULT 7 STEAM TUNNEL AND REPLACE STEAM PIPE B…
Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-03-19+$176,997$28,156,163PROJECT 578-17-027: REPLACE EXISTING STEAM PIPE FROM VAULT 9 TO VAULT 7 STEAM TUNNEL AND REPLACE STEAM PIPE B…
Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-04-12+$0$28,156,163PROJECT 578-17-027: REPLACE EXISTING STEAM PIPE FROM VAULT 9 TO VAULT 7 STEAM TUNNEL AND REPLACE STEAM PIPE B…
Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-07-18+$2,617,462$30,773,625PROJECT 578-17-027: REPLACE EXISTING STEAM PIPE FROM VAULT 9 TO VAULT 7 STEAM TUNNEL AND REPLACE STEAM PIPE B…
Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-08-19+$165,943$30,939,567PROJECT 578-17-027: REPLACE EXISTING STEAM PIPE FROM VAULT 9 TO VAULT 7 STEAM TUNNEL AND REPLACE STEAM PIPE B…
Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2025-08-04+$1,721,498$32,661,066PROJECT 578-17-027: REPLACE EXISTING STEAM PIPE FROM VAULT 9 TO VAULT 7 STEAM TUNNEL AND REPLACE STEAM PIPE B…
Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2025-09-22+$37,710$32,698,776PROJECT 578-17-027: REPLACE EXISTING STEAM PIPE FROM VAULT 9 TO VAULT 7 STEAM TUNNEL AND REPLACE STEAM PIPE B…
Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2025-11-25+$857,058$33,555,834PROJECT 578-17-027: P0007: REROUTE STEAM LINE AROUND EXISTING ELLIPTICAL LINE
Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2026-04-22+$114,195$33,670,029PROJECT 578-17-027: P0008: REVISE STRUCTURAL STEEL FOR PIPE SUPPORT.
Mod P00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2026-07-29+$493,785$34,163,814PROJECT 578-17-027: P0008: PROVIDE UNANTICIPATED ELECTRICAL REPAIRS AT VAULT 5 AND ASSOCIATED PIPES. MOD INVO…

Related awards · 6

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI TJJ6HHAK46Z3)

AwardOffice · PSC / listingNet obligationsFY
36C77622C0068PCAC (36C776) · Y1EZ · CONSTRUCTION OF OTHER INDUSTRIAL BUILDINGS$9,974,435FY2022

Other recipients under Z2NZ from 252-NETWORK CONTRACT OFFICE 12 (36C252) (most recent first)

AwardRecipientOfficeNet obligationsFY
36C25225P1115VALLEY MECHANICAL INC252-NETWORK CONTRACT OFFICE 12 (36C252)$22,250FY2025
36C25225C0025DI MEO BROTHERS, INC252-NETWORK CONTRACT OFFICE 12 (36C252)$19,865FY2025
36C25224N0519BLUE YONDER INC252-NETWORK CONTRACT OFFICE 12 (36C252)$219,159FY2024
VA69D17C0036MASTER DESIGN BUILD LLC252-NETWORK CONTRACT OFFICE 12 (36C252)$392,500FY2017
VA69D16C0283MASTERS BUILDING SOLUTIONS INC252-NETWORK CONTRACT OFFICE 12 (36C252)$3,439FY2016

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C25223C0072_3600_-NONE-_-NONE- · retrieved 2026-09-25.