Description
MOD4 TIME EXT. IN CONSIDERATION FOR EXT. WARRANTY MOD1 TIME EXTENSION INSTALLATION OF GFP GENERATOR CONSTRUCT GENERATOR DOCKING STATION PROJECT 757-20-205 - VAACC COLUMBUS, OH
Base award description: INSTALLATION OF GFP GENERATOR CONSTRUCT GENERATOR DOCKING STATION PROJECT 757-20-205 - VAACC COLUMBUS, OH
Modification chain · 5 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2021-06-21+$441,647= $441,647
- Mod P000012021-11-04-$643= $441,004
- Mod P000022021-11-10+$0= $441,004
- Mod P000032022-05-05+$0= $441,004
- Mod P000042022-07-11+$0= $441,004
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2021-06-21 | +$441,647 | $441,647 | INSTALLATION OF GFP GENERATOR CONSTRUCT GENERATOR DOCKING STATION PROJECT 757-20-205 - VAACC COLUMBUS, OH |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-11-04 | −$643 | $441,004 | MOD1 CREDIT 4 CHANGES IN MATERIALS INSTALLATION OF GFP GENERATOR CONSTRUCT GENERATOR DOCKING STATION PROJECT… |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-11-10 | +$0 | $441,004 | MOD1 TIME EXTENSION INSTALLATION OF GFP GENERATOR CONSTRUCT GENERATOR DOCKING STATION PROJECT 757-20-205 - VA… |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-05-05 | +$0 | $441,004 | MOD1 TIME EXTENSION INSTALLATION OF GFP GENERATOR CONSTRUCT GENERATOR DOCKING STATION PROJECT 757-20-205 - VA… |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-07-11 | +$0 | $441,004 | MOD4 TIME EXT. IN CONSIDERATION FOR EXT. WARRANTY MOD1 TIME EXTENSION INSTALLATION OF GFP GENERATOR CONSTRUCT… |
Related awards · 7
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI KLC3ALKFBAL9)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C25026C0124 | 250-NETWORK CONTRACT OFFICE 10 (36C250) · Y1LZ · CONSTRUCTION OF PARKING FACILITIES | $528,602 | FY2026 |
| 36C25025C0053 | 250-NETWORK CONTRACT OFFICE 10 (36C250) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $219,939 | FY2025 |
| 36C25024P1400 | 250-NETWORK CONTRACT OFFICE 10 (36C250) · J054 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PREFABRICATED STRUCTURES AND SCAFFOLDING | $12,988 | FY2024 |
| 36C78624C0007 | NATIONAL CEMETERY ADMIN (36C786) · R499 · SUPPORT- PROFESSIONAL: OTHER | $407,370 | FY2024 |
| 36C25023P1044 | 250-NETWORK CONTRACT OFFICE 10 (36C250) · J059 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $19,675 | FY2023 |
| 36C25023P0747 | 250-NETWORK CONTRACT OFFICE 10 (36C250) · J065 · MAINT/REPAIR/REBUILD OF EQUIPMENT- MEDICAL, DENTAL, AND VETERINARY EQUIPMENT AND SUPPLIES | $9,897 | FY2023 |
Other recipients under N028 from 250-NETWORK CONTRACT OFFICE 10 (36C250) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA25017P3019 | OHIO MACHINERY CO | 250-NETWORK CONTRACT OFFICE 10 (36C250) | $13,500 | FY2017 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C25021C0176_3600_-NONE-_-NONE- · retrieved 2026-09-26.