Description
ANNUAL AND QUARTERLY INSPECTIONS AND TESTING ON THE FIRE PUMP, DRY SPRINKLER SYSTEM, AND HYDRANTS.
Modification chain · 7 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2020-10-01+$13,230= $13,230
- Mod P000012021-08-27+$15,080= $28,310
- Mod P000022022-03-27+$0= $28,310
- Mod P000032022-10-01+$13,230= $41,540
- Mod P000042023-10-04+$13,230= $54,770
- Mod P000072024-09-17-$0= $54,770
- Mod P000062024-10-02+$13,230= $68,000
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2020-10-01 | +$13,230 | $13,230 | ANNUAL AND QUARTERLY INSPECTIONS AND TESTING ON THE FIRE PUMP, DRY SPRINKLER SYSTEM, AND HYDRANTS. |
| Mod P00001· EXERCISE AN OPTION | 2021-08-27 | +$15,080 | $28,310 | ANNUAL AND QUARTERLY INSPECTIONS AND TESTING ON THE FIRE PUMP, DRY SPRINKLER SYSTEM, AND HYDRANTS. |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-03-27 | +$0 | $28,310 | ANNUAL AND QUARTERLY INSPECTIONS AND TESTING ON THE FIRE PUMP, DRY SPRINKLER SYSTEM, AND HYDRANTS. |
| Mod P00003· EXERCISE AN OPTION | 2022-10-01 | +$13,230 | $41,540 | ANNUAL AND QUARTERLY INSPECTIONS AND TESTING ON THE FIRE PUMP, DRY SPRINKLER SYSTEM, AND HYDRANTS. |
| Mod P00004· EXERCISE AN OPTION | 2023-10-04 | +$13,230 | $54,770 | ANNUAL AND QUARTERLY INSPECTIONS AND TESTING ON THE FIRE PUMP, DRY SPRINKLER SYSTEM, AND HYDRANTS. |
| Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-09-17 | −$0 | $54,770 | ANNUAL AND QUARTERLY INSPECTIONS AND TESTING ON THE FIRE PUMP, DRY SPRINKLER SYSTEM, AND HYDRANTS. |
| Mod P00006· EXERCISE AN OPTION | 2024-10-02 | +$13,230 | $68,000 | ANNUAL AND QUARTERLY INSPECTIONS AND TESTING ON THE FIRE PUMP, DRY SPRINKLER SYSTEM, AND HYDRANTS. |
Related awards · 9
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI L3CVUQMB3NC9)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24526P0398 | 245-NETWORK CONTRACT OFFICE 5 (36C245) · J054 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PREFABRICATED STRUCTURES AND SCAFFOLDING | $18,000 | FY2026 |
| 36C25625P1753 | 256-NETWORK CONTRACT OFFICE 16 (36C256) · H212 · EQUIPMENT AND MATERIALS TESTING- FIRE CONTROL EQUIPMENT | $402,000 | FY2025 |
| 36C24125P0906 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · J012 · MAINT/REPAIR/REBUILD OF EQUIPMENT- FIRE CONTROL EQUIPMENT | $60,000 | FY2025 |
| 36C25725P0939 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · J012 · MAINT/REPAIR/REBUILD OF EQUIPMENT- FIRE CONTROL EQUIPMENT | $139,800 | FY2025 |
| 36C26125P1412 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · J063 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS | $661,500 | FY2025 |
| 36C24725P0777 | 247-NETWORK CONTRACT OFFICE 7 (36C247) · H312 · INSPECTION- FIRE CONTROL EQUIPMENT | $16,000 | FY2025 |
Other recipients under H942 from 250-NETWORK CONTRACT OFFICE 10 (36C250) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C25025P1120 | S 4 RISK MANAGEMENT INC | 250-NETWORK CONTRACT OFFICE 10 (36C250) | $5,496 | FY2025 |
| VA25115C0088 | INTRAM CO | 250-NETWORK CONTRACT OFFICE 10 (36C250) | $42,000 | FY2016 |
| VA25115C0054 | MEDIA PLUMBING & HEATING INC | 250-NETWORK CONTRACT OFFICE 10 (36C250) | $417,700 | FY2015 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C25021C0001_3600_-NONE-_-NONE- · retrieved 2026-09-26.