Description
TO PERFORM THIS WORK, THE CONTRACTOR WILL TEMPORARILY REMOVE EXISTING CHILLED WATER VALVE, INSTALL NEW VALVE, AND COORDINATE WITH SIEMENS TO ENSURE VALVE AND AHU IS OPERATING WITHIN ENERGY SAVINGS RANGE. TIME EXTENSION THROUGH FEB 17, 2023
Base award description: MATOC TVHS CONSTRUCTION - PROJECT 626-18-201, REPLACE AHU 18 BLDG. 1 CATH LAB
Modification chain · 5 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2020-10-16+$845,252= $845,252
- Mod P000012021-05-14+$0= $845,252
- Mod P000022021-09-15+$70,936= $916,188
- Mod P000032022-07-29+$27,753= $943,940
- Mod P000042022-12-05+$18,382= $962,323
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2020-10-16 | +$845,252 | $845,252 | MATOC TVHS CONSTRUCTION - PROJECT 626-18-201, REPLACE AHU 18 BLDG. 1 CATH LAB |
| Mod P00001· OTHER ADMINISTRATIVE ACTION | 2021-05-14 | +$0 | $845,252 | MATOC TVHS CONSTRUCTION - PROJECT 626-18-201, REPLACE AHU 18 BLDG. 1 CATH LAB |
| Mod P00002· OTHER ADMINISTRATIVE ACTION | 2021-09-15 | +$70,936 | $916,188 | MATOC TVHS CONSTRUCTION - PROJECT 626-18-201, REPLACE AHU 18 BLDG. 1 CATH LAB |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-07-29 | +$27,753 | $943,940 | FRAMING INCREASED AND OUTSIDE AIR SENSOR AND HANDRAIL TO BE RELOCATED DUE TO CONFLICT WITH INSULATED PANEL. T… |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-12-05 | +$18,382 | $962,323 | TO PERFORM THIS WORK, THE CONTRACTOR WILL TEMPORARILY REMOVE EXISTING CHILLED WATER VALVE, INSTALL NEW VALVE,… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI FMEUJEE7X2S8)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C77626N0166 | PCAC (36C776) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $1,000 | FY2026 |
| 36C77626D0027 | PCAC (36C776) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $0 | FY2026 |
| 36C25526C0054 | 255-NETWORK CONTRACT OFFICE 15 (36C255) · Z2NB · REPAIR OR ALTERATION OF HEATING AND COOLING PLANTS | $4,796,707 | FY2026 |
| 36C25526C0013 | 255-NETWORK CONTRACT OFFICE 15 (36C255) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $19,919,242 | FY2026 |
| 36C25626C0007 | 256-NETWORK CONTRACT OFFICE 16 (36C256) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $3,635,426 | FY2026 |
| 36C25626C0008 | 256-NETWORK CONTRACT OFFICE 16 (36C256) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $3,008,034 | FY2026 |
Other recipients under Z1NB from 249-NETWORK CONTRACT OFFICE 9 (36C249) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C24925C0035 | SAW GREENLAND, LLC | 249-NETWORK CONTRACT OFFICE 9 (36C249) | $41,222,156 | FY2025 |
| 36C24922C0114 | THE POVOLNY GROUP INC | 249-NETWORK CONTRACT OFFICE 9 (36C249) | $333,211 | FY2022 |
| 36C24922P0739 | JOHNSON CONTROLS INC | 249-NETWORK CONTRACT OFFICE 9 (36C249) | $435,134 | FY2022 |
| 36C24920C0138 | PARAMOUNT CONSTRUCTION GROUP, LLC | 249-NETWORK CONTRACT OFFICE 9 (36C249) | $4,338,340 | FY2020 |
| 36C24919N0425 | SEMPER TEK INC | 249-NETWORK CONTRACT OFFICE 9 (36C249) | $2,338,941 | FY2019 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C24921N0152_3600_36C24919D0060_3600 · retrieved 2026-09-25.