Description
THE PURPOSE OF THIS MODIFICATION IS TO EXTEND PROJECT 626-20-102 A TOTAL OF 350 CALENDAR DAYS FOR CPS SERVICES.
Base award description: TVHS HAS A REQUIREMENT FOR AE DESIGNS FOR THE RENOVATION OF THEIR WARD 3 SOUTH AREA.
Modification chain · 5 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2020-05-08+$996,386= $996,386
- Mod P000012020-09-03+$0= $996,386
- Mod P000022021-04-09+$0= $996,386
- Mod P000032021-09-23+$0= $996,386
- Mod P000052022-08-18-$254,942= $741,444
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2020-05-08 | +$996,386 | $996,386 | TVHS HAS A REQUIREMENT FOR AE DESIGNS FOR THE RENOVATION OF THEIR WARD 3 SOUTH AREA. |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-09-03 | +$0 | $996,386 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE ERROR ON PAGE 1 (SECTION 6) OF THE CONTRACT AWARD TO INFORM… |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-04-09 | +$0 | $996,386 | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND PROJECT 53 DAYS. |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-09-23 | +$0 | $996,386 | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND PROJECT 626-20-102 A TOTAL OF 350 CALENDAR DAYS FOR CPS SERVICE… |
| Mod P00005· FUNDING ONLY ACTION | 2022-08-18 | −$254,942 | $741,444 | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND PROJECT 626-20-102 A TOTAL OF 350 CALENDAR DAYS FOR CPS SERVICE… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI CKDKNLKHHAY4)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C78626N0326 | NATIONAL CEMETERY ADMIN (36C786) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $83,900 | FY2026 |
| 36S79726P0003 | NAC FACILITY PURCHASING SUPPORT (36S797) · Z1EZ · MAINTENANCE OF OTHER INDUSTRIAL BUILDINGS | $155,085 | FY2026 |
| 36C78626N0284 | NATIONAL CEMETERY ADMIN (36C786) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $35,363 | FY2026 |
| 36C24726C0029 | 247-NETWORK CONTRACT OFFICE 7 (36C247) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $107,680 | FY2026 |
| 36C24626C0010 | 246-NETWORK CONTRACTING OFFICE 6 (36C246) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $344,518 | FY2026 |
| 36C77025N0073 | NATIONAL CMOP OFFICE (36C770) · C1EZ · ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER INDUSTRIAL BUILDINGS | $149,525 | FY2025 |
Other recipients under C1DA from 249-NETWORK CONTRACT OFFICE 9 (36C249) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C24926N0655 | GDM-AE, INC. | 249-NETWORK CONTRACT OFFICE 9 (36C249) | $483,987 | FY2026 |
| 36C24926C0060 | THINKFORM DESIGN ARCHITECT LLC | 249-NETWORK CONTRACT OFFICE 9 (36C249) | $999,825 | FY2026 |
| 36C24926N0612 | TOLAND MIZELL MOLNAR LLC | 249-NETWORK CONTRACT OFFICE 9 (36C249) | $0 | FY2026 |
| 36C24926C0046 | INTEGRITY FEDERAL SERVICES, INC | 249-NETWORK CONTRACT OFFICE 9 (36C249) | $1,065,639 | FY2026 |
| 36C24926N0509 | FFE - HEAPY JV-II, LLC | 249-NETWORK CONTRACT OFFICE 9 (36C249) | $1,425,408 | FY2026 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C24920C0111_3600_-NONE-_-NONE- · retrieved 2026-09-26.