Description
EXTEND PERIOD OF PERFORMANCE END DATE.
Base award description: RIELLO UNINTERRUPTIBLE POWER SUPPLY
Modification chain · 3 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2025-09-26+$138,385= $138,385
- Mod P000012026-02-11+$3,850= $142,235
- Mod P000022026-03-25+$0= $142,235
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2025-09-26 | +$138,385 | $138,385 | RIELLO UNINTERRUPTIBLE POWER SUPPLY |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-02-11 | +$3,850 | $142,235 | RIELLO UNINTERRUPTIBLE POWER SUPPLY |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-03-25 | +$0 | $142,235 | EXTEND PERIOD OF PERFORMANCE END DATE. |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI KZFMFGZSHKW9)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24826P1030 | 248-NETWORK CONTRACT OFFICE 8 (36C248) · J059 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $1,397,847 | FY2026 |
| 36C24726P0104 | 247-NETWORK CONTRACT OFFICE 7 (36C247) · J061 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | $56,824 | FY2026 |
| 36C25625P1190 | 256-NETWORK CONTRACT OFFICE 16 (36C256) · J061 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | $174,969 | FY2025 |
| 36C24825P1269 | 248-NETWORK CONTRACT OFFICE 8 (36C248) · 6150 · MISCELLANEOUS ELECTRIC POWER AND DISTRIBUTION EQUIPMENT | $55,862 | FY2025 |
| 36C24925P0288 | 249-NETWORK CONTRACT OFFICE 9 (36C249) · J061 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | $1,500 | FY2025 |
| 36C24725P0414 | 247-NETWORK CONTRACT OFFICE 7 (36C247) · J059 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $7,462 | FY2025 |
Other recipients under 6150 from 248-NETWORK CONTRACT OFFICE 8 (36C248) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C24823C0042 | US VETERAN CONSTRUCTION & CONSULTING GROUP LLC | 248-NETWORK CONTRACT OFFICE 8 (36C248) | $1,909,820 | FY2023 |
| 36C24822P1751 | MEAK SOLUTIONS LLC. | 248-NETWORK CONTRACT OFFICE 8 (36C248) | $11,000 | FY2022 |
| 36C24821F0452 | ALVAREZ LLC | 248-NETWORK CONTRACT OFFICE 8 (36C248) | $42,648 | FY2021 |
| 36C24820P0780 | CCT, INC. | 248-NETWORK CONTRACT OFFICE 8 (36C248) | $31,031 | FY2020 |
| 36C24818P1248 | M.R. CRAFTS, INC. | 248-NETWORK CONTRACT OFFICE 8 (36C248) | $24,392 | FY2018 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C24825F0306_3600_47QSWA22D004E_4732 · retrieved 2026-09-26.