Description
REPLACE BOILER #2 AND CORRECT DEFICIENCIES AT BOILER PLANT - AE 672-20-602 - ADD VAAR CLAUSES
Base award description: REPLACE BOILER #2 AND CORRECT DEFICIENCIES AT BOILER PLANT (672-20-602) DESIGN SERVICES.
Modification chain · 5 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2022-03-31+$151,711= $151,711
- Mod P000012022-05-20+$0= $151,711
- Mod P000022024-08-06+$0= $151,711
- Mod P000032025-02-18+$13,189= $164,900
- Mod P000042026-04-07+$0= $164,900
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2022-03-31 | +$151,711 | $151,711 | REPLACE BOILER #2 AND CORRECT DEFICIENCIES AT BOILER PLANT (672-20-602) DESIGN SERVICES. |
| Mod P00001· OTHER ADMINISTRATIVE ACTION | 2022-05-20 | +$0 | $151,711 | REPLACE BOILER #2 AND CORRECT DEFICIENCIES AT BOILER PLANT (672-20-602) DESIGN SERVICES. MOD P00001 NTP. |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-08-06 | +$0 | $151,711 | REPLACE BOILER #2 AND CORRECT DEFICIENCIES AT BOILER PLANT (672-20-602) DESIGN SERVICES. MOD P00002 TE. |
| Mod P00003· OTHER ADMINISTRATIVE ACTION | 2025-02-18 | +$13,189 | $164,900 | REPLACE BOILER #2 AND CORRECT DEFICIENCIES AT BOILER PLANT - AE 672-20-602 - CPS OPTION P00003. |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-04-07 | +$0 | $164,900 | REPLACE BOILER #2 AND CORRECT DEFICIENCIES AT BOILER PLANT - AE 672-20-602 - ADD VAAR CLAUSES |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI R25JGNHCPTB6)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24726C0020 | 247-NETWORK CONTRACT OFFICE 7 (36C247) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $189,822 | FY2026 |
| 36C24825N1067 | 248-NETWORK CONTRACT OFFICE 8 (36C248) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $77,191 | FY2025 |
| 36C24825N1065 | 248-NETWORK CONTRACT OFFICE 8 (36C248) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $809,997 | FY2025 |
| 36C24825N0606 | 248-NETWORK CONTRACT OFFICE 8 (36C248) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $1,482,100 | FY2025 |
| 36C77625C0057 | PCAC (36C776) · C213 · ARCHITECT AND ENGINEERING- GENERAL: INSPECTION (NON-CONSTRUCTION) | $194,596 | FY2025 |
| 36C24824N1104 | 248-NETWORK CONTRACT OFFICE 8 (36C248) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $597,973 | FY2024 |
Other recipients under C223 from 248-NETWORK CONTRACT OFFICE 8 (36C248) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C24825N0845 | SPECIALIZED ENGINEERING SOLUTIONS INC | 248-NETWORK CONTRACT OFFICE 8 (36C248) | $552,423 | FY2025 |
| 36C24823C0107 | KSM A&E FEDERAL GROUP, LLC | 248-NETWORK CONTRACT OFFICE 8 (36C248) | $2,163,437 | FY2023 |
| 36C24823N0259 | AKEA DESIGN, INC. | 248-NETWORK CONTRACT OFFICE 8 (36C248) | $1,391,442 | FY2023 |
| 36C24822N0945 | TOLAND MIZELL MOLNAR LLC | 248-NETWORK CONTRACT OFFICE 8 (36C248) | $230,194 | FY2022 |
| 36C24822C0131 | GEO BANCROFT ENGINEERING LLC | 248-NETWORK CONTRACT OFFICE 8 (36C248) | $823,106 | FY2022 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C24822C0045_3600_-NONE-_-NONE- · retrieved 2026-09-26.