Description
EO14042. MODIFICATION TO INCORPORATE COVID-19 PROTOCOL REQUIREMENTS FOR FEDERAL CONTRACTORS.
Base award description: PREVENTIVE MAINTENANCE SERVICES FOR EMERGENCY GENERATORS AT THE WASHINGTON DC VAMC.
Modification chain · 2 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2020-11-10+$54,135= $54,135
- Mod P000012021-11-10+$0= $54,135
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2020-11-10 | +$54,135 | $54,135 | PREVENTIVE MAINTENANCE SERVICES FOR EMERGENCY GENERATORS AT THE WASHINGTON DC VAMC. |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-11-10 | +$0 | $54,135 | EO14042. MODIFICATION TO INCORPORATE COVID-19 PROTOCOL REQUIREMENTS FOR FEDERAL CONTRACTORS. |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI DLG2CENKQXL1)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24225P1399 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · J061 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | $24,651 | FY2025 |
| 36C24524P0165 | 245-NETWORK CONTRACT OFFICE 5 (36C245) · J028 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ENGINES, TURBINES, AND COMPONENTS | $10,061 | FY2024 |
| 36C24222P0005 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · H259 · EQUIPMENT AND MATERIALS TESTING- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $119,950 | FY2022 |
| 36C24221P1004 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · J059 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $13,768 | FY2021 |
| 36C24221P0006 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · H259 · EQUIPMENT AND MATERIALS TESTING- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $9,680 | FY2021 |
| 36C24420P0748 | 244-NETWORK CONTRACT OFFICE 4 (36C244) · J061 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | $41,331 | FY2020 |
Other recipients under J061 from 245-NETWORK CONTRACT OFFICE 5 (36C245) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C24526P0504 | WESTERN BRANCH DIESEL, LLC | 245-NETWORK CONTRACT OFFICE 5 (36C245) | $10,922 | FY2026 |
| 36C24526N0736 | VENERGY GROUP LLC | 245-NETWORK CONTRACT OFFICE 5 (36C245) | $25,050 | FY2026 |
| 36C24526N0625 | PIERLESS VENTURES-DVORAK JV, LLC | 245-NETWORK CONTRACT OFFICE 5 (36C245) | $8,700 | FY2026 |
| 36C24526N0635 | PIERLESS VENTURES-DVORAK JV, LLC | 245-NETWORK CONTRACT OFFICE 5 (36C245) | $16,700 | FY2026 |
| 36C24526P0445 | VERTIV CORPORATION | 245-NETWORK CONTRACT OFFICE 5 (36C245) | $74,424 | FY2026 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C24521P0087_3600_-NONE-_-NONE- · retrieved 2026-09-26.