Description
EO 14398 - OPTION YEAR 2 FUNDING: GENERATOR MAINTENANCE AND LOAD TESTING FOR VA HUDSON VALLEY HCS:
Base award description: GENERATOR MAINTENANCE AND LOAD TESTING FOR VA HUDSON VALLEY HCS
Modification chain · 12 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2022-10-01+$48,249= $48,249
- Mod P000012023-06-21+$0= $48,249
- Mod P000022023-09-29+$0= $48,249
- Mod P000032023-10-01+$50,652= $98,901
- Mod P000042024-09-12+$0= $98,901
- Mod P000052024-10-01+$50,652= $149,553
- Mod P000062025-02-18+$0= $149,553
- Mod P000072025-03-07-$80= $149,473
- Mod P000082025-09-29+$0= $149,473
- Mod P000092025-10-01+$53,163= $202,636
- Mod P000102026-03-26+$3,752= $206,388
- Mod P000112026-07-16+$0= $206,388
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2022-10-01 | +$48,249 | $48,249 | GENERATOR MAINTENANCE AND LOAD TESTING FOR VA HUDSON VALLEY HCS |
| Mod P00001· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2023-06-21 | +$0 | $48,249 | GENERATOR MAINTENANCE AND LOAD TESTING FOR VA HUDSON VALLEY HCS: NO COST MODIFICATION TO CHANGE TWO GENERATOR… |
| Mod P00002· EXERCISE AN OPTION | 2023-09-29 | +$0 | $48,249 | OPTION 1: GENERATOR MAINTENANCE AND LOAD TESTING FOR VA HUDSON VALLEY HCS: |
| Mod P00003· FUNDING ONLY ACTION | 2023-10-01 | +$50,652 | $98,901 | OPTION YEAR 1 FUNDING: GENERATOR MAINTENANCE AND LOAD TESTING FOR VA HUDSON VALLEY HCS: |
| Mod P00004· EXERCISE AN OPTION | 2024-09-12 | +$0 | $98,901 | OPTION YEAR 2: GENERATOR MAINTENANCE AND LOAD TESTING FOR VA HUDSON VALLEY HCS: |
| Mod P00005· FUNDING ONLY ACTION | 2024-10-01 | +$50,652 | $149,553 | OPTION YEAR 2 FUNDING: GENERATOR MAINTENANCE AND LOAD TESTING FOR VA HUDSON VALLEY HCS: |
| Mod P00006· OTHER ADMINISTRATIVE ACTION | 2025-02-18 | +$0 | $149,553 | OPTION YEAR 2 FUNDING: GENERATOR MAINTENANCE AND LOAD TESTING FOR VA HUDSON VALLEY HCS: |
| Mod P00007· FUNDING ONLY ACTION | 2025-03-07 | −$80 | $149,473 | OPTION YEAR 2 FUNDING: GENERATOR MAINTENANCE AND LOAD TESTING FOR VA HUDSON VALLEY HCS: |
| Mod P00008· EXERCISE AN OPTION | 2025-09-29 | +$0 | $149,473 | OPTION YEAR 2 FUNDING: GENERATOR MAINTENANCE AND LOAD TESTING FOR VA HUDSON VALLEY HCS: |
| Mod P00009· FUNDING ONLY ACTION | 2025-10-01 | +$53,163 | $202,636 | OPTION YEAR 2 FUNDING: GENERATOR MAINTENANCE AND LOAD TESTING FOR VA HUDSON VALLEY HCS: |
| Mod P00010· FUNDING ONLY ACTION | 2026-03-26 | +$3,752 | $206,388 | OPTION YEAR 2 FUNDING: GENERATOR MAINTENANCE AND LOAD TESTING FOR VA HUDSON VALLEY HCS: |
| Mod P00011· OTHER ADMINISTRATIVE ACTION | 2026-07-16 | +$0 | $206,388 | EO 14398 - OPTION YEAR 2 FUNDING: GENERATOR MAINTENANCE AND LOAD TESTING FOR VA HUDSON VALLEY HCS: |
Related awards · 10
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI FT97MKMJY487)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24119P1205 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · N059 · INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $25,497 | FY2019 |
| 36C24119P0510 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · J028 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ENGINES, TURBINES, AND COMPONENTS | $78,911 | FY2019 |
| 36C24119P0264 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · W038 · LEASE OR RENTAL OF EQUIPMENT- CONSTRUCTION, MINING, EXCAVATING, AND HIGHWAY MAINTENANCE EQUIPMENT | $19,665 | FY2019 |
| VA24115P1809 | 241-NETWORK CONTRACT OFFICE 01 · 3895 · MISCELLANEOUS CONSTRUCTION EQUIPMENT | $16,200 | FY2015 |
| VA805J25020 | NATIONAL CEMETERY ADMINISTRATION · 4010 · CHAIN AND WIRE ROPE | $3,212 | FY2012 |
Other recipients under H259 from 242-NETWORK CONTRACT OFFICE 02 (36C242) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C24225P0988 | BAMAJACK, LLC | 242-NETWORK CONTRACT OFFICE 02 (36C242) | $45,096 | FY2025 |
| 36C24225P0883 | CSIC SOLUTIONS LLC | 242-NETWORK CONTRACT OFFICE 02 (36C242) | $0 | FY2025 |
| 36C24224P1446 | KINSLEY GROUP, INC. | 242-NETWORK CONTRACT OFFICE 02 (36C242) | $18,775 | FY2024 |
| 36C24223P0022 | INNOVATIVE PEOPLE AND TECHNOLOGY CORPORATION | 242-NETWORK CONTRACT OFFICE 02 (36C242) | $824,516 | FY2023 |
| 36C24222P1145 | SOUTHWORTH-MILTON, INC. | 242-NETWORK CONTRACT OFFICE 02 (36C242) | $13,217 | FY2022 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C24223P0018_3600_-NONE-_-NONE- · retrieved 2026-09-26.