Description
ADD HX-1 CYL500 ACTUATOR WITH MOUNTIN KID FOR 4 BUILDING HEATERS. ADD 1 PLC BATTERY AND UNLOCK CODE. ADD 1 HX-2 CVL500 AND ONE CVL1000 ACTUATORS, PLC BATTERY AND UNLOCK CODE.
Base award description: EMERGENCY REPAIR HOT WATER HEAT EXCHANGERS HUDSON VALLEY REPLACE SX90 CONTROLLERS
Modification chain · 3 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2021-09-24+$9,762= $9,762
- Mod P000012021-11-29+$69,732= $79,494
- Mod P000022022-10-17-$10,494= $69,000
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2021-09-24 | +$9,762 | $9,762 | EMERGENCY REPAIR HOT WATER HEAT EXCHANGERS HUDSON VALLEY REPLACE SX90 CONTROLLERS |
| Mod P00001· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2021-11-29 | +$69,732 | $79,494 | ADD HX-1 CYL500 ACTUATOR WITH MOUNTIN KID FOR 4 BUILDING HEATERS. ADD 1 PLC BATTERY AND UNLOCK CODE. ADD 1 HX-… |
| Mod P00002· FUNDING ONLY ACTION | 2022-10-17 | −$10,494 | $69,000 | ADD HX-1 CYL500 ACTUATOR WITH MOUNTIN KID FOR 4 BUILDING HEATERS. ADD 1 PLC BATTERY AND UNLOCK CODE. ADD 1 HX-… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI CMTLME2MH6F4)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24526P0579 | 245-NETWORK CONTRACT OFFICE 5 (36C245) · J069 · MAINT/REPAIR/REBUILD OF EQUIPMENT- TRAINING AIDS AND DEVICES | $247,611 | FY2026 |
| 36C24126P0222 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · H352 · INSPECTION- MEASURING TOOLS | $16,657 | FY2026 |
| 36C24526P0155 | 245-NETWORK CONTRACT OFFICE 5 (36C245) · J045 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $99,135 | FY2026 |
| 36C25025P0716 | 250-NETWORK CONTRACT OFFICE 10 (36C250) · 6685 · PRESSURE, TEMPERATURE, AND HUMIDITY MEASURING AND CONTROLLING INSTRUMENTS | $0 | FY2025 |
| 36C24925P0121 | 249-NETWORK CONTRACT OFFICE 9 (36C249) · J045 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $3,500 | FY2025 |
| 36C24524P0567 | 245-NETWORK CONTRACT OFFICE 5 (36C245) · 4420 · HEAT EXCHANGERS AND STEAM CONDENSERS | $25,530 | FY2024 |
Other recipients under J045 from 242-NETWORK CONTRACT OFFICE 02 (36C242) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C24226P0794 | I-2-I SOLUTIONS, INC. | 242-NETWORK CONTRACT OFFICE 02 (36C242) | $17,225 | FY2026 |
| 36C24226P0682 | CALDAIA CONTROLS LLC | 242-NETWORK CONTRACT OFFICE 02 (36C242) | $65,300 | FY2026 |
| 36C24226C0100 | VETERANS CONTRACTING GROUP, INC. | 242-NETWORK CONTRACT OFFICE 02 (36C242) | $200,000 | FY2026 |
| 36C24226P0748 | TROY BOILER WORKS, INC | 242-NETWORK CONTRACT OFFICE 02 (36C242) | $15,395 | FY2026 |
| 36C24226P0534 | MILLER & CHITTY CO | 242-NETWORK CONTRACT OFFICE 02 (36C242) | $125,684 | FY2026 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C24221P1629_3600_-NONE-_-NONE- · retrieved 2026-09-26.