RANDY KINDER EXCAVATING INC

PIID 36C10F21C0014· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)· Y1PC · CONSTRUCTION OF UNIMPROVED REAL PROPERTY (LAND)· FY2021· $54,096,194 net obligations· UEI XMKUEVF3NMB5· MO

Description

FT. SAM HOUSTON NATIONAL CEMETERY PHASE 3 EXPANSION CONSTRUCTION TO DEFINITIZE OUTSTANDING CHANGE ORDERS, INCORPORATE REAS NEGOTIATED SETTLEMENT AND FINALIZE THE CONTRACT CLOSEOUT FOR THIS PROJECT.

Base award description: FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION)

First action · last action
2021-09-21 · 2026-01-08
Transactions
37
First transaction's obligation
$50,990,000
Base + all options value (sum of deltas)
$54,096,194
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Offers received
2
SDVOSB flag on record
Yes (self-representation)
NAICS
237990 · OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION

Modification chain · 37 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$54,096,194$0Base award · 2021-09-21 · this action $50,990,000 · running total $50,990,000Modification A00001 · 2022-03-22 · this action $12,951 · running total $51,002,951Modification P00002 · 2022-05-04 · this action $319,299 · running total $51,322,250Modification P00003 · 2022-06-24 · this action $408,039 · running total $51,730,289Modification P00004 · 2022-08-03 · this action $95,611 · running total $51,825,900Modification P00007 · 2022-10-26 · this action $0 · running total $51,825,900Modification P00006 · 2022-11-14 · this action $6,368 · running total $51,832,268Modification P00005 · 2022-11-30 · this action $30,831 · running total $51,863,098Modification A00009 · 2023-04-18 · this action $109,539 · running total $51,972,637Modification A00008 · 2023-04-27 · this action $26,631 · running total $51,999,268Modification A00010 · 2023-04-27 · this action -$240,697 · running total $51,758,572Modification P00012 · 2023-06-08 · this action $0 · running total $51,758,572Modification P00011 · 2023-08-08 · this action -$54,909 · running total $51,703,662Modification A00013 · 2023-09-27 · this action $182,988 · running total $51,886,650Modification A00014 · 2023-09-27 · this action $219,074 · running total $52,105,724Modification P00015 · 2023-11-29 · this action $107,220 · running total $52,212,943Modification A00016 · 2024-01-24 · this action $32,391 · running total $52,245,334Modification P00017 · 2024-02-02 · this action $0 · running total $52,245,334Modification P00018 · 2024-02-26 · this action $0 · running total $52,245,334Modification A00019 · 2024-03-27 · this action $16,011 · running total $52,261,344Modification P00020 · 2024-03-27 · this action $514,844 · running total $52,776,188Modification P00021 · 2024-03-29 · this action $0 · running total $52,776,188Modification A00022 · 2024-06-11 · this action $16,486 · running total $52,792,674Modification A00023 · 2024-06-11 · this action $0 · running total $52,792,674Modification A00024 · 2024-06-18 · this action $9,108 · running total $52,801,782Modification P00025 · 2024-06-21 · this action $38,090 · running total $52,839,872Modification P00026 · 2024-07-09 · this action $96,497 · running total $52,936,369Modification P00027 · 2024-07-11 · this action $69,503 · running total $53,005,873Modification P00028 · 2024-07-26 · this action $11,549 · running total $53,017,422Modification P00029 · 2024-09-12 · this action $20,910 · running total $53,038,332Modification P00030 · 2024-09-12 · this action -$19,141 · running total $53,019,191Modification P00031 · 2024-11-06 · this action $13,806 · running total $53,032,997Modification P00032 · 2024-11-06 · this action $2,978 · running total $53,035,974Modification P00033 · 2024-12-02 · this action $27,022 · running total $53,062,996Modification P00034 · 2025-04-08 · this action $0 · running total $53,062,996Modification P00035 · 2026-01-08 · this action -$395,569 · running total $52,667,427Modification P00036 · 2026-01-08 · this action $1,428,767 · running total $54,096,194
  • Base2021-09-21+$50,990,000= $50,990,000
  • Mod A000012022-03-22+$12,951= $51,002,951
  • Mod P000022022-05-04+$319,299= $51,322,250
  • Mod P000032022-06-24+$408,039= $51,730,289
  • Mod P000042022-08-03+$95,611= $51,825,900
  • Mod P000072022-10-26+$0= $51,825,900
  • Mod P000062022-11-14+$6,368= $51,832,268
  • Mod P000052022-11-30+$30,831= $51,863,098
  • Mod A000092023-04-18+$109,539= $51,972,637
  • Mod A000082023-04-27+$26,631= $51,999,268
  • Mod A000102023-04-27-$240,697= $51,758,572
  • Mod P000122023-06-08+$0= $51,758,572
  • Mod P000112023-08-08-$54,909= $51,703,662
  • Mod A000132023-09-27+$182,988= $51,886,650
  • Mod A000142023-09-27+$219,074= $52,105,724
  • Mod P000152023-11-29+$107,220= $52,212,943
  • Mod A000162024-01-24+$32,391= $52,245,334
  • Mod P000172024-02-02+$0= $52,245,334
  • Mod P000182024-02-26+$0= $52,245,334
  • Mod A000192024-03-27+$16,011= $52,261,344
  • Mod P000202024-03-27+$514,844= $52,776,188
  • Mod P000212024-03-29+$0= $52,776,188
  • Mod A000222024-06-11+$16,486= $52,792,674
  • Mod A000232024-06-11+$0= $52,792,674
  • Mod A000242024-06-18+$9,108= $52,801,782
  • Mod P000252024-06-21+$38,090= $52,839,872
  • Mod P000262024-07-09+$96,497= $52,936,369
  • Mod P000272024-07-11+$69,503= $53,005,873
  • Mod P000282024-07-26+$11,549= $53,017,422
  • Mod P000292024-09-12+$20,910= $53,038,332
  • Mod P000302024-09-12-$19,141= $53,019,191
  • Mod P000312024-11-06+$13,806= $53,032,997
  • Mod P000322024-11-06+$2,978= $53,035,974
  • Mod P000332024-12-02+$27,022= $53,062,996
  • Mod P000342025-04-08+$0= $53,062,996
  • Mod P000352026-01-08-$395,569= $52,667,427
  • Mod P000362026-01-08+$1,428,767= $54,096,194
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2021-09-21+$50,990,000$50,990,000FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION)
Mod A00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-03-22+$12,951$51,002,951FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION)
Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-05-04+$319,299$51,322,250FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION) IRRIGATION LINE ADJUSTMENT
Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-06-24+$408,039$51,730,289FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION) MEDICAL WASTE REMEDIATION
Mod P00004· CHANGE ORDER2022-08-03+$95,611$51,825,900FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION) RELOCATE EQUIPMENT STORAGE BUILDING TO AV…
Mod P00007· OTHER ADMINISTRATIVE ACTION2022-10-26+$0$51,825,900FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION) CHANGE OF CONTRACTING OFFICERS
Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-11-14+$6,368$51,832,268FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION) REMOVED UNFORESEEN MEDICAL WASTE IN THE M…
Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-11-30+$30,831$51,863,098FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION) RELOCATE ELECTRICAL LINE
Mod A00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-04-18+$109,539$51,972,637FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION) RELOCATE ELECTRICAL LINE
Mod A00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-04-27+$26,631$51,999,268FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION) RELOCATE ELECTRICAL LINE
Mod A00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-04-27−$240,697$51,758,572FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION) DESCOPE BELL TOWER, FENCE, ANGLE IRON AND…
Mod P00012· OTHER ADMINISTRATIVE ACTION2023-06-08+$0$51,758,572FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION) CHANGE PO# FOR IFAMS
Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-08-08−$54,909$51,703,662FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION) CREDIT FOR DE-SCOPED WORK AT THE COLUMBAR…
Mod A00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-09-27+$182,988$51,886,650FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION) MISCELLANEOUS SITE WORK
Mod A00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-09-27+$219,074$52,105,724FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION) MISCELLANEOUS SITE WORK
Mod P00015· CHANGE ORDER2023-11-29+$107,220$52,212,943FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION) CHANGE DOOR HARDWARE IN VARIOUS BUILDINGS
Mod A00016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-01-24+$32,391$52,245,334FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION) DESIGN CHANGES
Mod P00017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-02-02+$0$52,245,334FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION) NO COST TIME EXTENSION.
Mod P00018· OTHER ADMINISTRATIVE ACTION2024-02-26+$0$52,245,334FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION) NO COST TIME EXTENSION.
Mod A00019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-03-27+$16,011$52,261,344FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION) NO COST TIME EXTENSION.
Mod P00020· OTHER ADMINISTRATIVE ACTION2024-03-27+$514,844$52,776,188FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION) NO COST TIME EXTENSION.
Mod P00021· OTHER ADMINISTRATIVE ACTION2024-03-29+$0$52,776,188FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION) NO COST TIME EXTENSION.
Mod A00022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-06-11+$16,486$52,792,674FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION) NO COST TIME EXTENSION.
Mod A00023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-06-11+$0$52,792,674FT. SAM HOUSTON NATIONAL CEMETERY - PHASE 3 EXPANSION (CONSTRUCTION) NO COST TIME EXTENSION.
Mod A00024· OTHER ADMINISTRATIVE ACTION2024-06-18+$9,108$52,801,782FISCAL REASONS TO ATTACHED FUNDING TO A00023 FT. SAM HOUSTON NATIONAL CEMETERY PHASE 3 EXPANSION CONSTRUCTION…
Mod P00025· DEFINITIZE CHANGE ORDER2024-06-21+$38,090$52,839,872FISCAL REASONS TO ATTACHED FUNDING TO A00023 FT. SAM HOUSTON NATIONAL CEMETERY PHASE 3 EXPANSION CONSTRUCTION…
Mod P00026· CHANGE ORDER2024-07-09+$96,497$52,936,369FISCAL REASONS TO ATTACHED FUNDING TO A00023 FT. SAM HOUSTON NATIONAL CEMETERY PHASE 3 EXPANSION CONSTRUCTION…
Mod P00027· CHANGE ORDER2024-07-11+$69,503$53,005,873ADDING WORK WITHIN SCOPE (FANS TO EQUIP AND MAIN BLDG).
Mod P00028· CHANGE ORDER2024-07-26+$11,549$53,017,422FISCAL REASONS TO ATTACHED FUNDING TO A00023 FT. SAM HOUSTON NATIONAL CEMETERY PHASE 3 EXPANSION CONSTRUCTION…
Mod P00029· CHANGE ORDER2024-09-12+$20,910$53,038,332FISCAL REASONS TO ATTACHED FUNDING TO A00023 FT. SAM HOUSTON NATIONAL CEMETERY PHASE 3 EXPANSION CONSTRUCTION…
Mod P00030· CHANGE ORDER2024-09-12−$19,141$53,019,191FISCAL REASONS TO ATTACHED FUNDING TO A00023 FT. SAM HOUSTON NATIONAL CEMETERY PHASE 3 EXPANSION CONSTRUCTION…
Mod P00031· CHANGE ORDER2024-11-06+$13,806$53,032,997FISCAL REASONS TO ATTACHED FUNDING TO A00023 FT. SAM HOUSTON NATIONAL CEMETERY PHASE 3 EXPANSION CONSTRUCTION…
Mod P00032· CHANGE ORDER2024-11-06+$2,978$53,035,974FISCAL REASONS TO ATTACHED FUNDING TO A00023 FT. SAM HOUSTON NATIONAL CEMETERY PHASE 3 EXPANSION CONSTRUCTION…
Mod P00033· CHANGE ORDER2024-12-02+$27,022$53,062,996FISCAL REASONS TO ATTACHED FUNDING TO A00023 FT. SAM HOUSTON NATIONAL CEMETERY PHASE 3 EXPANSION CONSTRUCTION…
Mod P00034· CHANGE ORDER2025-04-08+$0$53,062,996FISCAL REASONS TO ATTACHED FUNDING TO A00023 FT. SAM HOUSTON NATIONAL CEMETERY PHASE 3 EXPANSION CONSTRUCTION…
Mod P00035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2026-01-08−$395,569$52,667,427FT. SAM HOUSTON NATIONAL CEMETERY PHASE 3 EXPANSION CONSTRUCTION TO DESCOPE CONTRACT WORK ASSOCIATED WITH PHAS…
Mod P00036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2026-01-08+$1,428,767$54,096,194FT. SAM HOUSTON NATIONAL CEMETERY PHASE 3 EXPANSION CONSTRUCTION TO DEFINITIZE OUTSTANDING CHANGE ORDERS, INCO…

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI XMKUEVF3NMB5)

AwardOffice · PSC / listingNet obligationsFY
36C25926C0030NETWORK CONTRACT OFFICE 19 (36C259) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES$8,570,100FY2026
36C10F25C0005OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Z2JZ · REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS$3,677,824FY2025
36C78624C0035NATIONAL CEMETERY ADMIN (36C786) · Y1PZ · CONSTRUCTION OF OTHER NON-BUILDING FACILITIES$3,595,875FY2024
36C10F22C0016OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1PC · CONSTRUCTION OF UNIMPROVED REAL PROPERTY (LAND)$20,321,493FY2022
36C10F22C0007OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1AZ · CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS$1,663,765FY2022
36C78620N0725NATIONAL CEMETERY ADMIN (36C786) · Z1AZ · MAINTENANCE OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS$45,280FY2020

Other recipients under Y1PC from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)

AwardRecipientOfficeNet obligationsFY
36C10F26C0005GC & V CONSTRUCTION LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$59,890,000FY2026
36C10F25C0007HAMILTON PACIFIC CHAMBERLAIN LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$637,437FY2025
36C10F24C0007SEABEE CONSTRUCTION, INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$79,106,191FY2024
36C10F24C0001RBVETCO, LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$38,940,668FY2024
36C10F23C0008SGC SERVICES 2, LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$42,010,850FY2023