Award recordCONTRACT

C & C CONTRACTORS LLC

PIID 36C10F19C0002· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)· Y1PC · CONSTRUCTION OF UNIMPROVED REAL PROPERTY (LAND)· FY2019· $26,390,113 net obligations· UEI Z6ZVR3MXC9L4· AL

Description

P00027 DEFINITIZES CHANGE ORDER P00026.

Base award description: IGF::OT CONSTRUCTION NAT'L CEMETERY OF THE ALLEGHENIES PHASE 3IGT::OT

First action · last action
2019-01-30 · 2024-12-04
Transactions
65
First transaction's obligation
$24,201,000
Base + all options value (sum of deltas)
$26,390,113
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SMALL BUSINESS SET ASIDE - TOTAL
Offers received
2
SDVOSB flag on record
Yes (self-representation)
NAICS
237990 · OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION

Modification chain · 65 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$26,566,733$0Base award · 2019-01-30 · this action $24,201,000 · running total $24,201,000Modification P00001 · 2019-02-13 · this action $0 · running total $24,201,000Modification P00002 · 2019-08-06 · this action $0 · running total $24,201,000Modification P00003 · 2020-01-29 · this action $0 · running total $24,201,000Modification P00004 · 2020-02-11 · this action $0 · running total $24,201,000Modification A00001 · 2020-04-26 · this action $18,000 · running total $24,219,000Modification P00007 · 2020-07-29 · this action $155,640 · running total $24,374,640Modification P00012 · 2020-11-09 · this action $160,000 · running total $24,534,640Modification P00006 · 2021-03-02 · this action -$156,000 · running total $24,378,640Modification P00013 · 2021-07-08 · this action $0 · running total $24,378,640Modification A00008 · 2021-12-14 · this action $0 · running total $24,378,640Modification A00021 · 2021-12-14 · this action $29,000 · running total $24,407,640Modification A00002 · 2022-01-02 · this action $20,000 · running total $24,427,640Modification A00003 · 2022-01-02 · this action $19,628 · running total $24,447,268Modification A00004 · 2022-01-02 · this action $4,000 · running total $24,451,268Modification A00005 · 2022-01-02 · this action $15,000 · running total $24,466,268Modification A00009 · 2022-01-02 · this action $6,272 · running total $24,472,540Modification A00010 · 2022-01-02 · this action $3,000 · running total $24,475,540Modification A00011 · 2022-01-02 · this action $7,287 · running total $24,482,827Modification A00013 · 2022-01-02 · this action $9,817 · running total $24,492,644Modification A00014 · 2022-01-02 · this action $49,855 · running total $24,542,499Modification A00015 · 2022-01-02 · this action $34,788 · running total $24,577,287Modification A00016 · 2022-01-02 · this action $99,678 · running total $24,676,965Modification A00025 · 2022-01-02 · this action $70,500 · running total $24,747,465Modification A00026 · 2022-01-02 · this action $11,443 · running total $24,758,908Modification A00029 · 2022-01-02 · this action $5,920 · running total $24,764,828Modification A00027 · 2022-01-03 · this action $118,000 · running total $24,882,828Modification A00028 · 2022-01-03 · this action $137,000 · running total $25,019,828Modification A00030 · 2022-01-03 · this action $27,439 · running total $25,047,267Modification P00014 · 2022-10-24 · this action $0 · running total $25,047,267Modification P00015 · 2022-12-09 · this action $97,858 · running total $25,145,125Modification A00023 · 2023-01-17 · this action $6,085 · running total $25,151,210Modification A00024 · 2023-01-17 · this action -$19,066 · running total $25,132,144Modification A00031 · 2023-01-17 · this action $7,377 · running total $25,139,521Modification A00033 · 2023-01-17 · this action $200,000 · running total $25,339,521Modification A00035 · 2023-01-17 · this action $37,816 · running total $25,377,337Modification A00036 · 2023-01-17 · this action $44,763 · running total $25,422,100Modification A00037 · 2023-01-17 · this action $4,689 · running total $25,426,789Modification A00039 · 2023-01-17 · this action $6,000 · running total $25,432,789Modification A00040 · 2023-01-18 · this action $34,200 · running total $25,466,989Modification A00042 · 2023-01-18 · this action $110,000 · running total $25,576,989Modification A00041 · 2023-01-19 · this action $25,000 · running total $25,601,989Modification A00043 · 2023-01-19 · this action $12,000 · running total $25,613,989Modification A00044 · 2023-01-19 · this action $15,629 · running total $25,629,618Modification A00038 · 2023-01-29 · this action $0 · running total $25,629,618Modification P00016 · 2023-02-13 · this action $550,000 · running total $26,179,618Modification A00017 · 2023-05-25 · this action $22,269 · running total $26,201,887Modification A00018 · 2023-05-25 · this action -$35,000 · running total $26,166,887Modification A00020 · 2023-05-25 · this action $39,418 · running total $26,206,305Modification A00022 · 2023-05-25 · this action $3,531 · running total $26,209,836Modification A00032 · 2023-05-25 · this action $63,129 · running total $26,272,965Modification A00045 · 2023-05-26 · this action $5,550 · running total $26,278,515Modification A00047 · 2023-05-26 · this action $17,858 · running total $26,296,373Modification P00018 · 2023-06-08 · this action $0 · running total $26,296,373Modification P00019 · 2023-07-17 · this action $262,814 · running total $26,559,187Modification A00046 · 2023-10-11 · this action $0 · running total $26,559,187Modification A00050 · 2024-01-23 · this action $7,546 · running total $26,566,733Modification P00020 · 2024-04-22 · this action $0 · running total $26,566,733Modification P00021 · 2024-06-27 · this action -$15,629 · running total $26,551,104Modification P00022 · 2024-06-28 · this action -$55,345 · running total $26,495,759Modification P00023 · 2024-09-23 · this action $0 · running total $26,495,759Modification P00024 · 2024-09-24 · this action $0 · running total $26,495,759Modification P00025 · 2024-09-24 · this action $0 · running total $26,495,759Modification P00026 · 2024-11-04 · this action $0 · running total $26,495,759Modification P00027 · 2024-12-04 · this action -$105,646 · running total $26,390,113
  • Base2019-01-30+$24,201,000= $24,201,000
  • Mod P000012019-02-13+$0= $24,201,000
  • Mod P000022019-08-06+$0= $24,201,000
  • Mod P000032020-01-29+$0= $24,201,000
  • Mod P000042020-02-11+$0= $24,201,000
  • Mod A000012020-04-26+$18,000= $24,219,000
  • Mod P000072020-07-29+$155,640= $24,374,640
  • Mod P000122020-11-09+$160,000= $24,534,640
  • Mod P000062021-03-02-$156,000= $24,378,640
  • Mod P000132021-07-08+$0= $24,378,640
  • Mod A000082021-12-14+$0= $24,378,640
  • Mod A000212021-12-14+$29,000= $24,407,640
  • Mod A000022022-01-02+$20,000= $24,427,640
  • Mod A000032022-01-02+$19,628= $24,447,268
  • Mod A000042022-01-02+$4,000= $24,451,268
  • Mod A000052022-01-02+$15,000= $24,466,268
  • Mod A000092022-01-02+$6,272= $24,472,540
  • Mod A000102022-01-02+$3,000= $24,475,540
  • Mod A000112022-01-02+$7,287= $24,482,827
  • Mod A000132022-01-02+$9,817= $24,492,644
  • Mod A000142022-01-02+$49,855= $24,542,499
  • Mod A000152022-01-02+$34,788= $24,577,287
  • Mod A000162022-01-02+$99,678= $24,676,965
  • Mod A000252022-01-02+$70,500= $24,747,465
  • Mod A000262022-01-02+$11,443= $24,758,908
  • Mod A000292022-01-02+$5,920= $24,764,828
  • Mod A000272022-01-03+$118,000= $24,882,828
  • Mod A000282022-01-03+$137,000= $25,019,828
  • Mod A000302022-01-03+$27,439= $25,047,267
  • Mod P000142022-10-24+$0= $25,047,267
  • Mod P000152022-12-09+$97,858= $25,145,125
  • Mod A000232023-01-17+$6,085= $25,151,210
  • Mod A000242023-01-17-$19,066= $25,132,144
  • Mod A000312023-01-17+$7,377= $25,139,521
  • Mod A000332023-01-17+$200,000= $25,339,521
  • Mod A000352023-01-17+$37,816= $25,377,337
  • Mod A000362023-01-17+$44,763= $25,422,100
  • Mod A000372023-01-17+$4,689= $25,426,789
  • Mod A000392023-01-17+$6,000= $25,432,789
  • Mod A000402023-01-18+$34,200= $25,466,989
  • Mod A000422023-01-18+$110,000= $25,576,989
  • Mod A000412023-01-19+$25,000= $25,601,989
  • Mod A000432023-01-19+$12,000= $25,613,989
  • Mod A000442023-01-19+$15,629= $25,629,618
  • Mod A000382023-01-29+$0= $25,629,618
  • Mod P000162023-02-13+$550,000= $26,179,618
  • Mod A000172023-05-25+$22,269= $26,201,887
  • Mod A000182023-05-25-$35,000= $26,166,887
  • Mod A000202023-05-25+$39,418= $26,206,305
  • Mod A000222023-05-25+$3,531= $26,209,836
  • Mod A000322023-05-25+$63,129= $26,272,965
  • Mod A000452023-05-26+$5,550= $26,278,515
  • Mod A000472023-05-26+$17,858= $26,296,373
  • Mod P000182023-06-08+$0= $26,296,373
  • Mod P000192023-07-17+$262,814= $26,559,187
  • Mod A000462023-10-11+$0= $26,559,187
  • Mod A000502024-01-23+$7,546= $26,566,733
  • Mod P000202024-04-22+$0= $26,566,733
  • Mod P000212024-06-27-$15,629= $26,551,104
  • Mod P000222024-06-28-$55,345= $26,495,759
  • Mod P000232024-09-23+$0= $26,495,759
  • Mod P000242024-09-24+$0= $26,495,759
  • Mod P000252024-09-24+$0= $26,495,759
  • Mod P000262024-11-04+$0= $26,495,759
  • Mod P000272024-12-04-$105,646= $26,390,113
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2019-01-30+$24,201,000$24,201,000IGF::OT CONSTRUCTION NAT'L CEMETERY OF THE ALLEGHENIES PHASE 3IGT::OT
Mod P00001· CHANGE ORDER2019-02-13+$0$24,201,000SUSPENSION OF WORK
Mod P00002· CHANGE ORDER2019-08-06+$0$24,201,0002ND SUSPENSION OF WORK
Mod P00003· CHANGE ORDER2020-01-29+$0$24,201,000LIFT SUSPENSION RESUME WORK
Mod P00004· CHANGE ORDER2020-02-11+$0$24,201,000ADMIN CHANGE TO CHANGE CO TO MIKO NEWELL.
Mod A00001· CHANGE ORDER2020-04-26+$18,000$24,219,000A00001-CO-01A - CONSTRUCT SPOILS AREA ACCESS ROAD
Mod P00007· CHANGE ORDER2020-07-29+$155,640$24,374,640REPLACE UNSUITABLE SOILS, SECTION 13 TOE KEY
Mod P00012· CHANGE ORDER2020-11-09+$160,000$24,534,640P00012.CO-01G, CONSTRUCT INTERIM DIVERSION ROAD FOR MORGAN ROAD BRIDGE CONSTRUCTION
Mod P00006· CHANGE ORDER2021-03-02−$156,000$24,378,640P00006-CO-01D - ONSITE BORROW AREA EARLY TURN OVER (ETO), SECTION 14 (C&C VARIANCE REQUEST #1)
Mod P00013· OTHER ADMINISTRATIVE ACTION2021-07-08+$0$24,378,640P00006-CO-01D - ONSITE BORROW AREA EARLY TURN OVER (ETO), SECTION 14 (C&C VARIANCE REQUEST #1)
Mod A00008· DEFINITIZE CHANGE ORDER2021-12-14+$0$24,378,640A00008.SA-02, CONSTRUCT SPOILS AREA ACCESS ROAD, DEFINITIZE A00001.CO-01A
Mod A00021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-12-14+$29,000$24,407,640A00021.SA-14
Mod A00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-01-02+$20,000$24,427,640A00002.SA-07 RECONNECT EXISTING IRRIGATION SYSTEM (COMMITTAL SHELTER #1)
Mod A00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-01-02+$19,628$24,447,268A00003-SA-01 - RELOCATE NATURAL GAS LINE, COMMITTAL SHELTER #1
Mod A00004· CHANGE ORDER2022-01-02+$4,000$24,451,268A00004-CO-01C, CONSTRUCT TEMPORARY MEMORIAL SHELTER, CS#3
Mod A00005· CHANGE ORDER2022-01-02+$15,000$24,466,268A00005 CO-01F REPAIR NCOTA IRRIGATION PUMP SYSTEM
Mod A00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-01-02+$6,272$24,472,540A00009.SA-03 ~ MODIFY SECTION 7 CONSTRUCTION TURNAROUND AREA
Mod A00010· DEFINITIZE CHANGE ORDER2022-01-02+$3,000$24,475,540A00010.SA-04 PROVIDE TEMPORARY TENT AT CS3 FOR MEMORIAL SERVICES DEF A00004.CO-01C
Mod A00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-01-02+$7,287$24,482,827A00011.SA-05 LOCATE AND CAP EXISTING IRRIGATION LOOP
Mod A00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-01-02+$9,817$24,492,644A00013.SA-06 INSTALL TEMPORARY ELECTRIC WATER HEATER
Mod A00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-01-02+$49,855$24,542,499A00014.SA-08 EXTEND IRRIGATION TO NCOTA FRONT ENTRANCE
Mod A00015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-01-02+$34,788$24,577,287A00015.SA-09 INSTALL TOE KEY FOR MORGAN ROAD BRIDGE AND APPROACHES
Mod A00016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-01-02+$99,678$24,676,965A00016.SA-10 MODIFY COMMITTAL SHELTER #1 SIDEWALKS AND HONOR GUARD PARKING
Mod A00025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-01-02+$70,500$24,747,465A00025.SA-19 - MORGAN BYPASS ROAD (DEFINITIZE P00012.CO-01G)
Mod A00026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-01-02+$11,443$24,758,908A00026.SA-20 ?DQE UTILITY POLE RELOCATION ALONG MORGAN RD
Mod A00029· CHANGE ORDER2022-01-02+$5,920$24,764,828A00029.CO-01J WALKWAY ELECTRICAL RELOCATION/DELETE SEWER LINE RELOCATION
Mod A00027· CHANGE ORDER2022-01-03+$118,000$24,882,828A00027.CO-01I - EXTEND THE LAWN IRRIGATION SYSTEM TO THE NEW SOD AT THE NEW BRIDGE CROSSING OVER MORGAN RD.
Mod A00028· CHANGE ORDER2022-01-03+$137,000$25,019,828A00028.CO-01H PIC BUILDING CORTEGE LANE UPGRADE
Mod A00030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-01-03+$27,439$25,047,267A00030.SA-21 EXISTING STORM END WALLS REPAIRS
Mod P00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-10-24+$0$25,047,267EXCUSABLE DELAY.
Mod P00015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-12-09+$97,858$25,145,125PROJECT SCHEDULE TIME EXTENSION.
Mod A00023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-01-17+$6,085$25,151,210A00023.SA-17 MEZZANINE RAILING
Mod A00024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-01-17−$19,066$25,132,144A00023.SA-18 - EXIST COLUMBARIUM WALKS
Mod A00031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-01-17+$7,377$25,139,521A00031.SA-22 ? THREE ADDITIONAL TDC 600S HANDHELDS
Mod A00033· CHANGE ORDER2023-01-17+$200,000$25,339,521A00033.CO-01K - REPLACE EXISTING IRRIGATION PUMP WITH NEW PUMP.
Mod A00035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-01-17+$37,816$25,377,337A00035.SA-25 IRRIGATION RADIO COMMUNICATION
Mod A00036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-01-17+$44,763$25,422,100A00036.SA 26 IRR SHOPPING LIST REPAIRS
Mod A00037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-01-17+$4,689$25,426,789A00037.SA 27 PIC YARD DRAIN
Mod A00039· CHANGE ORDER2023-01-17+$6,000$25,432,789A00039.CO 01L IRR CONTROLLER BOX A
Mod A00040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-01-18+$34,200$25,466,989A00040.SA-29 SPOILS AREA FILL FOUNDATION BENCH
Mod A00042· CHANGE ORDER2023-01-18+$110,000$25,576,989A00042.CO-01N ADDITIONAL ASPHALT REPLACEMENT
Mod A00041· CHANGE ORDER2023-01-19+$25,000$25,601,989A00041.CO-01M WEATHER STATION
Mod A00043· CHANGE ORDER2023-01-19+$12,000$25,613,989A00043.CO-01O SPOILS AREA GATE AND BARRIERS
Mod A00044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-01-19+$15,629$25,629,618A00044.SA-30 TEMPORARY COMMITTAL SHELTER INSTALLATION AT MAINTENANCE YARD
Mod A00038· DEFINITIZE CHANGE ORDER2023-01-29+$0$25,629,618A00038.SA-28 DEF A00027.CO-01H DEF BRIDGE IRR
Mod P00016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-02-13+$550,000$26,179,618SETTLEMENT AGREEMENT WITHIN THE SCOPE OF WORK MODIFICATION.
Mod A00017· OTHER ADMINISTRATIVE ACTION2023-05-25+$22,269$26,201,887ADMINISTRATIVE MODIFICATION TO RECREATE DELETED FOLDER AND AWARD ACTION IN ECMS THAT WAS OBLIGATED IN FMS ON 0…
Mod A00018· OTHER ADMINISTRATIVE ACTION2023-05-25−$35,000$26,166,887ADMINISTRATIVE MODIFICATION TO RECREATE DELETED FOLDER AND AWARD ACTION IN ECMS THAT WAS OBLIGATED IN FMS ON 0…
Mod A00020· OTHER ADMINISTRATIVE ACTION2023-05-25+$39,418$26,206,305ADMINISTRATIVE MODIFICATION TO RECREATE DELETED FOLDER AND AWARD ACTION IN ECMS THAT WAS OBLIGATED IN FMS ON 1…
Mod A00022· OTHER ADMINISTRATIVE ACTION2023-05-25+$3,531$26,209,836ADMINISTRATIVE MODIFICATION TO RECREATE DELETED FOLDER AND AWARD ACTION IN ECMS THAT WAS OBLIGATED IN FMS ON 1…
Mod A00032· OTHER ADMINISTRATIVE ACTION2023-05-25+$63,129$26,272,965ADMINISTRATIVE MODIFICATION TO RECREATE DELETED FOLDER AND AWARD ACTION IN ECMS THAT WAS OBLIGATED IN FMS ON 1…
Mod A00045· CHANGE ORDER2023-05-26+$5,550$26,278,515A00045.CO-01P ADDITIONAL DRAIN BEHIND MEMORIAL WALL (AWARDED BY CO TO COMPLETE ALREADY OBLIGATED MODIFICATION…
Mod A00047· CHANGE ORDER2023-05-26+$17,858$26,296,373MODIFICATION TO DEFINITIZE ASPHALT REPAIRS. (AWARDED BY CO TO COMPLETE AN OBLIGATION BY ACO)
Mod P00018· OTHER ADMINISTRATIVE ACTION2023-06-08+$0$26,296,373NCOTA - P00018 OBLIGATION NUMBER CHANGE DUE TO VA TRANSITION TO A NEW FINANCIAL AND ACQUISITION MANAGEMENT SYS…
Mod P00019· DEFINITIZE CHANGE ORDER2023-07-17+$262,814$26,559,187NCOTA - P00019 SETTLEMENT BY DETERMINATION
Mod A00046· CHANGE ORDER2023-10-11+$0$26,559,187A00046.CO-01Q DELETE OSSUARY
Mod A00050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-01-23+$7,546$26,566,733A00050 CARD READER PIC BUILDING
Mod P00020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-04-22+$0$26,566,733P00020 EXTENDED WARRANTY
Mod P00021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-06-27−$15,629$26,551,104P00021 COMMITTAL SHELTER DEOBLIGATION
Mod P00022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-06-28−$55,345$26,495,759P00022 DEFINITIZE A00033
Mod P00023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-09-23+$0$26,495,759P00023 DEFINITIZE A00043
Mod P00024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-09-24+$0$26,495,759P00024 DEFINITIZE A00005
Mod P00025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-09-24+$0$26,495,759P00025 DEFINITIZE A00039
Mod P00026· CHANGE ORDER2024-11-04+$0$26,495,759P00026 STOP WORK
Mod P00027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-12-04−$105,646$26,390,113P00027 DEFINITIZES CHANGE ORDER P00026.

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI Z6ZVR3MXC9L4)

AwardOffice · PSC / listingNet obligationsFY
36C78626C0020NATIONAL CEMETERY ADMIN (36C786) · Y1AZ · CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS$31,145,450FY2026
36C24726C0055247-NETWORK CONTRACT OFFICE 7 (36C247) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES$9,079,864FY2026
36C78626N0338NATIONAL CEMETERY ADMIN (36C786) · Y1AZ · CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS$122,570FY2026
36C78626N0342NATIONAL CEMETERY ADMIN (36C786) · Z2JZ · REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS$361,151FY2026
36C78625C0042NATIONAL CEMETERY ADMIN (36C786) · Y1JZ · CONSTRUCTION OF MISCELLANEOUS BUILDINGS$24,203,981FY2025
36C78625N0565NATIONAL CEMETERY ADMIN (36C786) · Y1AZ · CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS$281,750FY2025

Other recipients under Y1PC from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)

AwardRecipientOfficeNet obligationsFY
36C10F26C0005GC & V CONSTRUCTION LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$59,890,000FY2026
36C10F25C0007HAMILTON PACIFIC CHAMBERLAIN LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$637,437FY2025
36C10F24C0007SEABEE CONSTRUCTION, INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$79,106,191FY2024
36C10F24C0001RBVETCO, LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$38,940,668FY2024
36C10F23C0008SGC SERVICES 2, LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$42,010,850FY2023

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C10F19C0002_3600_-NONE-_-NONE- · retrieved 2026-09-26.